Difference between revisions of "Integrating Climate Change into the ICZM planning process - Introduction"

From MarineSpecies Traits Wiki
Jump to: navigation, search
 
(19 intermediate revisions by 2 users not shown)
Line 13: Line 13:
 
</imagemap>
 
</imagemap>
 
__TOC__
 
__TOC__
This document provides some guidance on the steps to be taken in including climate change related issues into the ICZM process. It is based on the view that climate adaptation measures should be an integral part of the process and not an add-on or a separate component. The structure adopted is that used by the Integrative Methodological Framework for coastal, river basin and aquifer management and by the Guidelines for the preparation of National ICZM strategies <ref>The ICZM process has been presented in the three related documents prepared by the Priority Actions
+
This document provides some guidance on the steps to be taken in including climate change related issues into the [[ICZM_Process_diagram|ICZM process]]. It is based on the view that climate adaptation measures should be an integral part of the process and not an add-on or a separate component. The structure adopted is that used by the Integrative Methodological Framework for coastal, river basin and aquifer management and by the Guidelines for the preparation of National ICZM strategies <ref>The ICZM process has been presented in the three related documents prepared by the Priority Actions
 
Programme: “Towards Converging Management Approaches for Mediterranean Coastal Zones: An Integrated Methodological Framework for coastal, river basin and aquifer management”, April, 2012; “Guidelines for the preparation of National ICZM Strategies required by the Integrated Coastal Zone Management (ICZM) Protocol for the Mediterranean”, June, 2011; and “ICZM Process” (PEGASO Platform).</ref> (henceforth referred to as the IMF document), which identify the following key steps:
 
Programme: “Towards Converging Management Approaches for Mediterranean Coastal Zones: An Integrated Methodological Framework for coastal, river basin and aquifer management”, April, 2012; “Guidelines for the preparation of National ICZM Strategies required by the Integrated Coastal Zone Management (ICZM) Protocol for the Mediterranean”, June, 2011; and “ICZM Process” (PEGASO Platform).</ref> (henceforth referred to as the IMF document), which identify the following key steps:
  
=== ESTABLISHMENT: Aim & Objectives ===
+
== ESTABLISHMENT: Aim & Objectives ==
 
   
 
   
 
* [[CC_ICZM_Process/Establishment#Establishing coordination mechanisms|Establishing coordination mechanisms]]
 
* [[CC_ICZM_Process/Establishment#Establishing coordination mechanisms|Establishing coordination mechanisms]]
* Defining territorial scope
+
* [[CC_ICZM_Process/Establishment#Defining territorial scope|Defining territorial scope]]
* Defining governance context
+
* [[CC_ICZM_Process/Establishment#Defining governance context|Defining governance context]]
* Scoping
+
* [[CC_ICZM_Process/Establishment#Scoping|Scoping]]
* Engaging Stakeholders
+
* [[CC_ICZM_Process/Establishment#Engaging_the_stakeholders|Engaging the Stakeholders]]
* Proposing the vision
+
* [[CC_ICZM_Process/Establishment#Proposing the vision|Proposing the vision]]
* Decision on Strategic Environmental Assessment
+
* [[CC_ICZM_Process/Establishment#Decision on Strategic Environmental Assessment|Decision on Strategic Environmental Assessment]]
  
=== ANALYSIS & FUTURES: Aim and Objectives ===  
+
== ANALYSIS & FUTURES: Aim and Objectives ==  
  
* Building the evidence
+
* [[Integrating_Climate_Change_into_the_ICZM_planning_process_-_Analysis_and_Future#Building_the_evidence|Building the evidence]]
* Identifying futures
+
* [[Integrating_Climate_Change_into_the_ICZM_planning_process_-_Analysis_and_Future#Identifying futures|Identifying futures]]
  
===  SETTING THE VISION: Aim & Objectives ===  
+
==  SETTING THE VISION: Aim & Objectives ==  
  
* Building consensus
+
* [[CC_ICZM_Process/Setting_the_vision#Building_consensus|Building consensus]]
* Setting the direction
+
* [[CC_ICZM_Process/Setting_the_vision#Setting_the_direction|Setting the direction]]
* Measuring success
+
* [[CC_ICZM_Process/Setting_the_vision#Measuring_success|Measuring success]]
  
===  DESIGNING THE FUTURE: Aim & Objectives ===  
+
==  DESIGNING THE FUTURE: Aim & Objectives ==  
  
* Formulating ICZM Strategies, Plans or Programmes
+
*[[CC_ICZM_Process/Designing_the_Future#Formulating_ICZM_strategies.2C_Plans_and_Programmes|Formulating ICZM Strategies, Plans or Programmes]]
* Establishing Management structure
+
* [[CC_ICZM_Process/Designing_the_Future#Establishing_Management_structure|Establishing Management structure]]
* Embedding  
+
* [[CC_ICZM_Process/Designing_the_Future#Embedding|Embedding]]
  
=== REALISING THE VISION: Aims and Objectives ===  
+
== REALISING THE VISION: Aims and Objectives ==  
  
* Implementing
+
* [[CC_ICZM_Process/Realizing_the_Vision#Implementing|Implementing]]
* Investment and Infrastructure
+
* [[CC_ICZM_Process/Realizing_the_Vision#Investment_and_Infrastructure|Investment and Infrastructure]]
* Acting
+
* [[CC_ICZM_Process/Realizing_the_Vision#Acting|Acting]]
* Monitoring and Review
+
* [[CC_ICZM_Process/Realizing_the_Vision#Monitoring_and_Review|Monitoring and Review]]
  
  
The IMF document notes that actions related to climate change need to be integrated in the respective frameworks. The present report goes through each of the stages listed above and indicates how the climate change dimension should be addressed, both at the strategy stage as well as in the preparation of the coastal plans at both the national and local levels. In both cases the context is the Mediterranean.
+
[[ICZM_Process_diagram|The IMF document]] notes that actions related to climate change need to be integrated in the respective frameworks. The present report goes through each of the stages listed above and indicates how the climate change dimension should be addressed, both at the strategy stage as well as in the preparation of the coastal plans at both the national and local levels. In both cases the context is the Mediterranean.
 +
 
 +
 
 +
==Related articles==
 +
:[[Climate adaptation policies for the coastal zone]]
 +
:[[Sea level rise]]
 +
:Articles in the category [http://www.coastalwiki.org/wiki/Category:Climate_change Climate change]
  
 
{{PAP/RAC‎}}
 
{{PAP/RAC‎}}
Line 57: Line 63:
 
----
 
----
 
<references/>
 
<references/>
 +
 +
 +
[[category:Climate Change in the ICZM Process]]

Latest revision as of 21:17, 1 August 2019


Introduction  


Establishment  


Analysis and Futures  


Setting the Vision  


Designing the Future  


Realising the Vision  


 


CC ICZM Process/EstablishmentCC ICZM Process/Analysis and FutureCC ICZM Process/Setting the visionCC ICZM Process/Designing the FutureCC ICZM Process/Realizing the VisionICZM pegaso 3 1.png
About this image

This document provides some guidance on the steps to be taken in including climate change related issues into the ICZM process. It is based on the view that climate adaptation measures should be an integral part of the process and not an add-on or a separate component. The structure adopted is that used by the Integrative Methodological Framework for coastal, river basin and aquifer management and by the Guidelines for the preparation of National ICZM strategies [1] (henceforth referred to as the IMF document), which identify the following key steps:

ESTABLISHMENT: Aim & Objectives

ANALYSIS & FUTURES: Aim and Objectives

SETTING THE VISION: Aim & Objectives

DESIGNING THE FUTURE: Aim & Objectives

REALISING THE VISION: Aims and Objectives


The IMF document notes that actions related to climate change need to be integrated in the respective frameworks. The present report goes through each of the stages listed above and indicates how the climate change dimension should be addressed, both at the strategy stage as well as in the preparation of the coastal plans at both the national and local levels. In both cases the context is the Mediterranean.


Related articles

Climate adaptation policies for the coastal zone
Sea level rise
Articles in the category Climate change


This article has been drafted by PAP/RAC
Please note that others may also have edited the contents of this article.



  1. The ICZM process has been presented in the three related documents prepared by the Priority Actions Programme: “Towards Converging Management Approaches for Mediterranean Coastal Zones: An Integrated Methodological Framework for coastal, river basin and aquifer management”, April, 2012; “Guidelines for the preparation of National ICZM Strategies required by the Integrated Coastal Zone Management (ICZM) Protocol for the Mediterranean”, June, 2011; and “ICZM Process” (PEGASO Platform).